Page 1 of 1
Mating Delay?
Posted: Fri Nov 07, 2014 8:25 am
by showxxl
Have a mule that wont un-shrink, says it has a mating delay till 9/11/2014? Two months ago...
Re: Mating Delay?
Posted: Fri Nov 07, 2014 8:37 am
by MARX
pretend it says 11/9/2014.
Either that or fire up the DeLorean
Re: Mating Delay?
Posted: Fri Nov 07, 2014 8:54 am
by showxxl
MARX wrote:pretend it says 11/9/2014.
Either that or fire up the DeLorean
Let me guess, this server is not in the US... It's somewhere where they use a measuring system that is logical and makes since.
Re: Mating Delay?
Posted: Fri Nov 07, 2014 9:56 am
by MARX
Although i may be proven wrong if this has to do with the timer issue in bees and items left on the ground.
Re: Mating Delay?
Posted: Fri Nov 07, 2014 11:30 am
by showxxl
Ok, iv'e tied 5 mules together using pet leashes so they should be able to get me up to 88mh. Used an Item change deed on a GOC and named it flux capacitor. All I need now is someone that can cast lightning strike.
Re: Mating Delay?
Posted: Fri Nov 07, 2014 3:02 pm
by Wil
showxxl wrote:Ok, iv'e tied 5 mules together using pet leashes so they should be able to get me up to 88mh. Used an Item change deed on a GOC and named it flux capacitor. All I need now is someone that can cast lightning strike.
You need an Umm. Umms attract lightning.
The Excelsior date format regularly trips me up too. I could live with 11/9/2014 and I prefer the lack of ambiguity in 2014/11/09 but this 9/11/2014 stuff where the most significant digits are left to right but the most significant timespans are the opposite (right to left) throws me for a loop. Logical and makes sense? To who?
Regards.
Wil